Project Highlights Since its completion in 1936, Route U.S. 93 over Hoover Dam has served as a major transportation corridor. In those 70 years, increased traffic volume combined with the large number of pedestrian visitors at the dam has necessitated a bypass route. The new Colorado River Bridge, just down-stream of the dam, will carry traffic 900 feet above the river avoiding the sharp turns and narrow roadway leading to the dam. |
|
|
Our Role McNary Bergeron & Associates is providing construction engineering services for the arch construction. This includes the structural design for the temporary stay cable system (anchorages, towers and cable connections at the arch ribs) as well as arch rib shop drawings and an independent review of the formtraveler design. |
|
|
Construction Method and Specifications
|
|
|
Owner FHWA Central Federal Lands Highway Division (CFLHD) |
Contractor Obayashi / PSM (Joint Venture) |
|
Designer TYLin / HDR |
Construction Analysis OPAC Engineers |
|
Total Project Cost $114 million |
Cable Stay Supplier Schwager Davis, Inc. |
|
Project Website |
Timeline Fall 2001 to Winter 2010 |
|
Project Photos |
|
|
|
|
|
|
|
|
|
|
![]() |
|
|
|
||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||