PROJECT HIGHLIGHTS: FOLSOM DAM BYPASS BRIDGE
Completion of the Folsom Dam Bridge will restore a much needed route for the city of Folsom, CA. The road over the dam was closed to public traffic after September 11, 2001, prompting the need for a new bridge over the American River.
Our Role
McNary Bergeron & Associates is providing construction engineering services to Kiewit Pacific for the cast-in-place segmental bridge. These services include construction analysis, geometry control, and shop drawings for the 970 ft long structure.
Construction Method and Specifications
- Cast-in-place segmental using form travelers
- Bridge length = 970 ft
- Main span = 430 ft
- Width = 80 ft
Owner
US Army Corp of Engineers
Contractor
Kiewit Pacific Co.
Designer
CH2M-Hill/URS
PT Supplier
Schwager Davis, Inc.
Total Contract Value
$75 million
Timeline
January 2007 to December 2008